As part of the ongoing Anaheim Street Improvement Project all four Long Beach (710) Freeway on- and off-ramps for eastbound Anaheim Street will be closed beginning at 8 p.m. on Friday, Jan. 24 through 5 a.m., Jan. 27. Traffic will be detoured to Pacific Coast Highway.
Type of Work: Lane closure
Area of Work: Eastbound Ocean Boulevard will have one lane closed from SR-47 to Pier T Avenue. Access to eastbound Ocean Boulevard via the SR-47 on-ramp will remain open during the lane and shoulder closure.
When: 7 p.m., Friday, Jan. 24 to 5 a.m., Saturday, Jan. 25
Type of Work: On-ramp closure
Area of Work: The westbound Ocean Boulevard on-ramp from Pier T Avenue will be closed. The temporary westbound ramp begins at the Pier T Avenue/Pier T Lane intersection – approximately 300 feet from the former westbound on-ramp. The detour route follows Pier T Lane to Pier S Lane and connects at the westbound Ocean Boulevard off-ramp for Pier S/Terminal Island Freeway (SR-47) where motorists can travel through the intersection toward San Pedro or drive north on SR-47.
When: Closed through mid- to late-2014
For your convenience, we include traffic impacts from other construction projects in the area from the Port of Long Beach, Caltrans and the City of Long Beach.
Type of Work: On- and off-ramp closures
Area of Work: All four Long Beach (710) Freeway on- and off-ramps onto eastbound Anaheim Street will be closed as part of the ongoing Anaheim Street Improvement Project. Traffic will be detoured to the Pacific Coast Highway (PCH) ramps. Traffic on Anaheim Street is reduced to two lanes in each direction from the L.A. River to 9th Street. Limited access will be allowed via side streets. (Project information)
When: 710 Freeway on- and off-ramp closure will take place from 8 p.m., Friday, Jan. 24 to 5 a.m., Monday, Jan. 27. Ongoing, Anaheim Street work takes place on weekdays from 7 a.m. to 3:30 p.m.
Use Harbor Avenue, Santa Fe Avenue or 9th Street to cross Anaheim Street
Type of Work: Lane closure
Area of Work: Santa Fe Avenue, between Anaheim Street and West Willow Street, is reduced to one lane in each direction for City of Long Beach Public Works maintenance.
When: 7 p.m. to 4 p.m., Friday, Jan. 24 and Saturday, Jan. 25.
Type of Work: Lane closure
Area of Work: One lane will remain open in each direction on the Gerald Desmond Bridge for Los Angeles Department of Public Works maintenance.
When: Eastbound traffic lane closure will take place from 2 a.m. to 12 p.m., Saturday, Jan. 25 and 5 a.m. to 5 p.m., Sunday, Jan. 26. Westbound traffic lane closure will take place from 5 a.m. to 5 p.m. on Sunday, Jan. 26.
Type of Work: Lane closure
Area of Work: Pico Avenue between Broadway and Ocean Blvd., is reduced to one lane in each direction for a pipeline installation.
When: 8 a.m. to 4 p.m., Monday-Friday
Join the Parade of Trees Gala at the Dalmatian American Club, Nov. 14. This…
The Port of Long Beach is moving cargo ahead of the pace achieved last…
Page Against The Machine invites you to celebrate the victories where we find them (or…
City of Long Beach to Host Community Meeting on Marine Debris and Trash Capture System…
The letter was signed by 88 House Democrats.
The report alleges that the Downtown LA Law Group paid recruiters to aggressively target people…