Briefs

Port of Long Beach Releases Pier Wind Project Concept

The Port of Long Beach May 9 released plans for a facility conceived to help California and the nation reach renewable energy targets in the coming decades. 

The floating offshore wind facility – known as Pier Wind – would support the manufacture and assembly of offshore wind turbines standing as tall as the Eiffel Tower. It would be the largest facility at any U.S. seaport specifically designed to accommodate the assembly of offshore wind turbines.

“Imagine fully assembled wind turbines capable of generating 20 megawatts of energy towed by sea from the Port of Long Beach to offshore wind farms in Central and Northern California,” said Port of Long Beach Executive Director Mario Cordero. “As society transitions to clean energy, our harbor is ideally located for such an enterprise – with calm seas behind a federal breakwater, one of the deepest and widest channels in the U.S., direct access to the open ocean and no air height restrictions. No other location has the space to achieve the economies of scale needed to drive down the cost of energy for these huge turbines.”

The Pier Wind project helps California harness the powerful wind in deep waters in order to generate renewable energy. The project will enhance air quality by reducing reliance on fossil fuels; meet California’s goal of producing 25 gigawatts of offshore wind power by 2045; and contribute toward lowering the national cost of offshore wind power by 70% by 2035.

The facility would span up to 400 acres of newly built land located southwest of the Long Beach International Gateway Bridge within the Harbor district. The port’s concept study, available here, provides information to continue planning and discussion with state and federal officials, developers and funders for the $4.7 billion project. Pier Wind would also create new jobs and career opportunities for the communities closest to the port that have been disproportionately impacted by climate change and port operations. Construction could potentially start in January 2027, with the first 100 acres operational in early 2031, the second 100 acres operational in late 2031, and the last 200 acres coming online in 2035.

Details: polb.com/pierwind.

Reporters Desk

Recent Posts

Letters to the Editor: Deadly Merger, Disability Rights, War of Choice, and the Call for Peace and Voting

Stop the Deadly Merger Like many Americans, I am opposed to my tax dollars continuing…

2 days ago

The Myth Behind The J6 Insurrection Is Back — And California Is In Its Crosshairs

Voter fraud is as rare as hen’s teeth. A Brookings Institute study of vote-by-mail ballot…

3 days ago

Trick Versus Trust

  The scariest part of this post-Halloween election will come after the votes are cast…

3 days ago

Champagne, Sparkling Wine, and the Stories in the Glass

By Lynn NIshimura, Columnist   Champagne has a fascinating relationship with popular culture. One of…

3 days ago

Harbor Commission Votes to Replace Pacific Harbor Line With Union Pacific/BNSF Subsidiary

But The Story Is Far From Over Pacific Harbor Line has provided short line rail…

3 days ago

Discover 12,000 Years of Culture at San Pedro’s AKM Cultural Fair

  San Pedro is an established destination for art, and starting on November’s First Thursday…

3 days ago